: Start by securing the front and rear stabilizer bars to the main base frame. It is essential to keep the bolts finger-tight until the entire frame is squared to ensure all holes align correctly.
: Always begin by placing the floor or base panels on a flat surface with support rings facing down. Cable Routing : This is the most complex part. Refer to the cable assembly diagrams Fitness Repair Parts
Before turning a single bolt, the manual stresses a . The Dp Dual Trac 20 assembly manual typically lists 14 major component groups:
Cable Length - Pull-Point (?) 89.75 in. ( 1) 90.375 in. ( 1) 227 in. ( 1) 281.5 in. ( 1) 417.25 in. ( 1) End #1 (?) A-1/2-13x2"N ( Fitness Repair Parts