The Blue Book replaced the earlier Form of Contract for Dredging and Reclamation Works (2nd Edition, 2006) —which was actually a separate document often confused with the test version. The 2016 edition is the current, authoritative version.
: It offers flexibility in payment methods, allowing for lump sum, unit rate, or cost-plus arrangements. IADC Dredging Structure and Content fidic blue book 2016 pdf
The is a tool, not a magic wand. It requires careful tailoring to local laws, insurance requirements, and project-specific risks. Always involve a legal professional experienced in marine construction and FIDIC contracts before signing. The Blue Book replaced the earlier Form of
The contract consists of the following general conditions: IADC Dredging Structure and Content The is a
The FIDIC Blue Book 2016, formally known as the "Conditions of Contract for Plant and Design/Build", is a standard form of contract published by the Fédération Internationale Des Ingénieurs-Conseils (FIDIC). This contract is intended for use on plant and design/build projects where the contractor is responsible for both the design and construction of the works.
: Designed for all types of dredging projects, though it may require adaptation for highly complex offshore or marine construction.
The default is unless the Particular Conditions state otherwise. This is critical because material swells (bulks up) when dredged. A contractor paid in situ but who swells material by 30% loses money.