This is the core of the report, typically shown in a table format to track % completion. Activity Description Location (Floor/Zone) Progress (%) Status (Pending/Done) Mechanical Ducting installation Level 3 & 4 In Progress Insulation Electrical Conduit embedding In Progress Cable Tray Installation Basement B1 In Progress PPR Pipe Installation Toilet Block A Pressure Testing Toilet Block A Fire Fight. Sprinkler Piping In Progress 4. Technical Activities & Milestones Completed Work:
To maximize its value, an MEP Work Progress Report must evolve from a static PDF into a . In best practices, digital tools (like BIM 360 or Procore) link the report directly to the 3D model. A sample report in a digital format would include hyperlinks: clicking on "Chilled water piping – Zone 3" opens the exact BIM coordinates, showing a clash with an electrical tray. Furthermore, attaching daily photo logs turns vague text into verifiable evidence. A picture of a completed riser with a pressure gauge reading 150 PSI is infinitely more valuable than a line item stating "Riser tested." mep work progress report sample