Ps-855b Maintenance Manual !full! -

The following parts are used in the PS-855B:

This is the most crucial maintenance step. It involves a timed discharge to ensure the battery can sustain the rated load for the required duration (usually 30 or 60 minutes, depending on the aircraft's certification). ps-855b maintenance manual

Proper service often requires specialized equipment as outlined in the PS-850/855 Battery Maintenance Guide . The following parts are used in the PS-855B:

: Specific models are required to simulate aircraft loads during bench testing. ps-855b maintenance manual

Pin It on Pinterest