| Code | Motion Element | Description | |------|----------------|-------------| | | Reaching (Hinlangen) | Moving empty hand to object | | G | Grasping (Greifen) | Taking hold of part/tool | | B | Moving (Bewegen) | Transporting part/tool through air | | F | Guiding (Führen) | Aligning and positioning | | Z | Inserting (Zusammenfügen) | Joining two components (e.g., pin into hole) | | L | Releasing (Loslassen) | Letting go of part | | SB | Side motion (Seitenbewegen) | Very short movement (<10 cm) | | W | Turning (Wenden) | Rotating wrist or part |
The story of the is one of the oldest foundations in the European installation industry, acting as the silent blueprint for building climate and sanitary systems for decades. The Origin: Experience Over Science TABEL MONTAGE TIJDEN CONFORM GUSTAV ENDE
Hoe groter de buisdiameter, hoe hoger de montagetijd per meter of per verbinding. Dit loopt vaak op van kleine maten (15mm) tot industriële maten (DN300+). 3. Handeling Het beugelen en plaatsen van de buis zelf. Appendages: Het monteren van kranen, afsluiters of meters. Aansluitingen: Het maken van verbindingen (fittingen). Voorbeeldtabel (Indicatief) | Code | Motion Element | Description |